What would you like to do next?

Key Features

Features and upgrades that enhance comfort, convenience, safety, performance,
or technology beyond the standard equipment.

Navigation
Back-up Camera
Blind Spot Monitoring
Trailer Tow
Sync
Adaptive Cruise Control
Android Auto
Apple CarPlay

Get Pre-Approved

No Credit Check
No Credit Check
No impact on your credit score

Immediate Decision
Immediate Decision
Get a Pre-Approval decision in seconds

Vehicle Specs

Exterior Color
Agate Black/Marsh Gray
Interior Color
Norias/Mesa
Bodystyle
Crew Cab Truck
Engine
3.5l V6 Ecoboost
Transmission
ELECTRONIC 10-SPEED AUTOMATIC
Drivetrain
4x4
Odometer
10
VIN
1FTFW6L82TFA86328
Stock Number
4004779

Well-Equipped Vehicle

Well-equipped vehicle with features and upgrades that enhance comfort, convenience, safety, performance, or technology beyond the standard equipment.
View Key Features

Experience Better Benefits

Commission-Free Certified Guides

Anderson Certified Guides are not paid on Commission, rather, Guides are paid to find you the perfect vehicle and give you a great experience.

5-Day Return or Exchange Policy

If you are not happy with your Anderson Auto Group vehicle, bring the vehicle back within 5 days and under 200 miles and exchange it or get a full refund subject to the conditions.

Collision Deductible Reimbursement

In the event of a collision incident, where your insurance is handling the repairs to the Anderson Auto Group vehicle, this policy will reimburse you for up to the first $500 of your deductible.

Description

This Agate Black Metallic 2026 Ford F-150King Ranch is a great choice! Checkout the following:

City17/HWY 23



ENGINE: 3.5L V6 ECOBOOST, AGATE BLACK METALLIC





Convenience

  • With the adaptive cruise control activated, the vehicle will use cameras and/or navigation data to automatically slow down for curves in the road ahead that may be too sharp for the current set speed. It will accelerate back to the set speed when the road straightens out.
  • If the vehicle detects prolonged driver unresponsiveness it will automatically bring the vehicle to a stop and turn on the hazard lights. If equipped, emergency services will be contacted.

Safety and Security

  • Steering assist and/or lane centering will maintain the vehicle’s position within the lane with minimal input from the driver. This feature enables the vehicle to drive semi-autonomously on highways without the driver having to keep their hands on the wheel, however they must be ready to resume control of the vehicle at any point.
  • BlueCruise hands-on cruise control with lane change
  • The vehicle constantly monitors the roadway in front of the vehicle and identifies and tracks pedestrians on an interior display. If the system determines a likely impact, it will automatically take preventative steps to avoid hitting the pedestrian.
  • The vehicle is equipped with a camera that displays an image of the area behind the vehicle on an interior display.
  • An active lane departure system alerts the driver of unintended movement of the vehicle out of a designated traffic lane and automatically maintains the vehicle’s position within that lane using countermeasures such as braking and/or steering. If the driver uses the turn signals, the system is temporarily disabled.
  • The vehicle is equipped with a system that senses, and then prepares, the vehicle and/or occupants, for an impending rear collision.

Technology and Telematics

  • SYNC 4 AppLink/Apple CarPlay/Android Auto smart device wireless mirroring
  • Mobile devices can wirelessly connect to the internet through the vehicle’s private mobile network.


  • Engine: 3.5L V6 EcoBoost -inc: auto start-stop technology
  • GVWR: 7100 lbs Payload Package
  • Transmission w/Driver Selectable Mode
  • Electronic Transfer Case
  • Part And Full-Time Four-Wheel Drive
  • 200 Amp Alternator
  • 80-Amp/Hr 800CCA Maintenance-Free Battery w/Run Down Protection
  • Trailer Wiring Harness
  • Class IV Towing Equipment -inc: Hitch Brake Controller and Trailer Sway Control
  • 1945# Maximum Payload
  • HD gas-pressurized shock absorbers
  • Front Anti-Roll Bar
  • Electric Power-Assist Steering
  • 36 Gal. Fuel Tank
  • Single Stainless Steel Exhaust w/Chrome Tailpipe Finisher
  • Auto Locking Hubs
  • Double Wishbone Front Suspension w/Coil Springs
  • Solid Axle Rear Suspension w/Leaf Springs
  • 4-Wheel Disc Brakes w/4-Wheel ABS Front And Rear Vented Discs Brake Assist Hill Hold Control and Electric Parking Brake
  • TIRES: 275/60R20 BSW A/T
  • Regular Box Style
  • Steel Spare Wheel
  • Full-Size Spare Tire Stored Underbody w/Crankdown
  • Colored Rear Step Bumper
  • Colored Front Bumper w/Colored Rub Strip/Fascia Accent and 2 Tow Hooks
  • Black Side Windows Trim
  • Body-Colored Door Handles
  • Power Rear Window w/Defroster
  • Deep Tinted Glass
  • Rain Detecting Variable Intermittent Wipers
  • Aluminum Panels
  • Colored Grille w/Chrome Surround
  • Integrated Tailgate Step
  • Power Open And Close Tailgate Rear Cargo Access
  • Integrated Storage
  • Cargo Lamp w/High Mount Stop Light
  • Perimeter/Approach Lights
  • Headlights-Automatic Highbeams
  • Front Fog Lamps
  • Cornering Lights
  • LED Brakelights
  • Streaming Audio
  • Fixed Antenna
  • 8 Speakers
  • 2 LCD Monitors In The Front
  • Driver Seat
  • Passenger Seat
  • 60-40 Folding Split-Bench Front Facing Heated Fold-Up Cushion Rear Seat
  • Power Tilt/Telescoping Steering Column
  • Heated Leather Steering Wheel w/Auto Tilt-Away
  • Front Cupholder
  • Rear Cupholder
  • Compass
  • Garage Door Transmitter
  • Cruise Control w/Steering Wheel Controls
  • HVAC -inc: Underseat Ducts and Console Ducts
  • Voice Activated Dual Zone Front Automatic Air Conditioning
  • Locking glove box
  • Full Cloth Headliner
  • Leather/Chrome Gear Shifter Material
  • Interior Trim -inc: Genuine Wood/Metal-Look Instrument Panel Insert Cabback Insulator Leather Door Panel Insert Leather Console Insert and Chrome/Metal-Look Interior Accents
  • Day-Night Auto-Dimming Rearview Mirror
  • Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination
  • Full Floor Console w/Locking Storage Mini Overhead Console w/Storage 1 12V DC Power Outlet and 2 Interior 120V AC Power Outlets
  • Fade-To-Off Interior Lighting
  • Front And Rear Map Lights
  • Cab Mounted Cargo Lights
  • Connected Navigation Integrated Navigation System w/Voice Activation
  • Instrument Panel Bin Dashboard Storage Interior Concealed Storage Driver / Passenger And Rear Door Bins and 2nd Row Underseat Storage
  • Delayed Accessory Power
  • Power Adjustable Pedals
  • Driver Information Center
  • Redundant Digital Speedometer
  • Outside Temp Gauge
  • Digital/Analog Appearance
  • 2 Seatback Storage Pockets
  • Front Center Armrest and Rear Center Armrest
  • Manual w/Tilt Front Head Restraints and Manual Adjustable Rear Head Restraints
  • Perimeter Alarm
  • Securilock Anti-Theft Ignition (pats) Immobilizer
  • Air Filtration
  • 1 12V DC Power Outlet
  • 1 12V DC Power Outlet and 2 Interior 120V AC Power Outlets
  • Side Impact Beams
  • Dual Stage Driver And Passenger Seat-Mounted Side Airbags
  • BLIS (Blind Spot Information System) Blind Spot
  • PCA with AEB and Intersection Assist
  • Cross-Traffic Alert with Reverse Brake Assist
  • Collision Mitigation-Front
  • Forward and Reverse Sensing System Front And Rear Parking Sensors
  • Aerial View Camera System
  • Tire Specific Low Tire Pressure Warning
  • Dual Stage Driver And Passenger Front Airbags
  • Airbag Occupancy Sensor
  • Safety Canopy System Curtain 1st And 2nd Row Airbags
  • Outboard Front Lap And Shoulder Safety Belts -inc: Rear Center 3 Point Height Adjusters and Pretensioners
  • Rear child safety locks
  • Reverse Camera Back-Up Camera
  • Front Camera w/Washer
  • Left Side Camera
  • Right Side Camera
  • ENGINE: 3.5L V6 ECOBOOST
  • EQUIPMENT GROUP 601A HIGH
  • AGATE BLACK METALLIC

New 2026 Ford F-150 King Ranch for Sale in Lincoln, NE

Discover the power and capability of the New 2026 Ford F-150 King Ranch at Anderson Ford of Lincoln South in Lincoln, NE. Whether you're shopping from Lincoln, Omaha or beyond, this new F-150 offers the performance, comfort, and reliability drivers count on.

Visit our dealership in Lincoln, NE to explore this New Ford and more. We proudly serve the Lincoln, Omaha area with an unbeatable selection of cars, trucks, and SUVs.

Questions About The New Ford F-150 King Ranch

You can purchase the 2026 Ford F-150 at Anderson Ford of Lincoln South, proudly serving Lincoln, Omaha from our location in Lincoln, NE.

Yes! Schedule a test drive at Anderson Ford of Lincoln South in Lincoln, NE to experience the 2026 Ford F-150 King Ranch firsthand.

Schedule Test Drive

The Ford F-150 is known for its performance, safety, and reliability perfect for drivers in Lincoln, NE and surrounding areas like Lincoln, Omaha.

This Ford F-150 is equipped with navigation, back-up camera, blind spot monitoring, trailer tow, sync, adaptive cruise control, android auto, and apple carplay that enhance comfort, convenience, safety, performance, or technology beyond the standard equipment.

Protect your vehicle

From the minor dents to mechanical breakdowns - these products have you covered.

Protect your vehicle
Vehicle Service Contracts
Vehicle Service Contracts

Imagine driving with complete peace of mind, knowing that unexpected mechanical breakdowns won’t derail your plans or your budget. You deserve a service contract that is simple, straightforward, and provides valuable protection when a breakdown occurs.

Term Protect
Term Protect

Nothing looks worse on your new car than the damage caused by tree sap, road salt, bird waste and other environmental elements.

EV Vehicle Service Contract
EV Vehicle Service Contract

The cost of routine maintenance is an expense no one likes. Select from a variety of Maintenance Plans to cover the cost of routine maintenance.

Bundle 109 (Tire & Wheel, Paintless Dent Repair, and Key Replacement)
Bundle 109 (Tire & Wheel, Paintless Dent Repair, and Key Replacement)

Protect yourself from everyday mishaps with our Tire & Wheel, Key Replacement, and Paintless Dent Repair (PDR) coverage. This package helps cover the cost of tire and wheel damage from road hazards, lost or damaged keys with 24/7 lockout assistance, and repairs minor dents and dings to keep your vehicle looking its best.

GAP Coverage
GAP Coverage

GAP Coverage offers peace of mind by helping cover the difference between your insurance payout and the remaining balance on your loan or lease if your vehicle is totaled, stolen, or damaged beyond repair. Without it, you could be left paying out of pocket for a vehicle you no longer have. GAP protection bridges that financial gap so you're not stuck with the bill.

Windshield Repair/Replacement
Windshield Repair/Replacement

Our Windshield Repair/Replacement coverage helps keep your view clear and your vehicle protected. Small chips, stars, and cracks can be quickly repaired with a specialized sealant, and if the damage can’t be fixed, your windshield will be replaced. It's a simple solution for unexpected glass damage.

Pricing and Availability Conditions
Price does not include tax, title, and license fees. Vehicle price includes a $299 administration fee. All pricing and details are believed to be accurate, but we do not warrant or guarantee such accuracy. The prices shown above, may vary from region to region, as will incentives, and are subject to change. New vehicle pricing reflects rebates to dealer when financing through Ford. With approved credit. Not all will qualify. Vehicle information is based off standard equipment and may vary from vehicle to vehicle. Call or email for complete vehicle specific information.